Our Project
Saudi Aramco, Qurayyah
Saudi Aramco
1,020 m2 solar field; 0.60 MWth
Qurayyah Sea Water Plant, KSA
103 to 174ᣞC
Oil & Gas
864 MWhth/y (846 kWh/y/m2)
Boiler feedwater pre-heating
115,200 l/y of diesel
Engineering and solar plant supply (construction contracted to a local qualified EPC)
300 ton/y of CO2
Challenge
The largest oil company in the world, Saudi Aramco, set the priority to cut liquid fuels in its production, processing and utility sites, as part of the decarbonization of its core processes. Solar thermal is required to supply boiler feedwater pre-heating up to 174ᣞC even when covered by dust to cut the sensible heat demand from 3 different boilers.
Solution
TVP integrates 3 separate water-to-water heat exchangers, controlled by same SCADA, delivering energy at required temperature without any panel cleaning (recording only 15% yearly energy losses from soiling effect)